CEN 308 — RIDEAU CANAL AND OTTAWA RIVER, FIRST EDITION, 2003


Chapter 8 — Paragraph 42, after “(Cumberland sector).”

Insert:A seasonal ice boom is placed between December 15 and March 31 and removed as soon as ice conditions allow for navigation.

(Q2019-022.1)
(Monthly Edition No. 04/19)


Chapter 8 — Adjacent to paragraph 42, add a caution pictograph.

(Q2019-022.2)
(Monthly Edition No. 04/19)


Chapter 9 — Paragraph 72, after “Lac Saint-Louis.”

Delete: “The lock chamber … sill depth of 2.7 m.”

Replace by:The lock is 54.9 m long and 11.9 m wide; it has a depth of 2.7 m over the sills.

(Q2018-018.1)
(Monthly Edition No. 02/19)


Chapter 9 — Delete paragraph 74 and the adjacent marina pictograph.

(Q2018-018.2)
(Monthly Edition No. 02/19)


Chapter 9 — Paragraph 80, after “Île Bellevue.”

Delete: “Marina Georges Proulx … Sainte-Anne-de-Bellevue bridges.”

(Q2018-018.3)
(Monthly Edition No. 02/19)


Chapter 9 — Delete paragraph 81.

(Q2018-018.4)
(Monthly Edition No. 02/19)


Chapter 9 — Paragraph 85, after “summer residences.”

Delete: “There is a partly … NW shore of the bay.”

(Q2018-018.5)
(Monthly Edition No. 02/19)


Chapter 9 — Delete paragraph 90

Replace by:90 Two submerged pipelines extend from shore 0.3 mile SE of the Vaudreuil wharf.

(Q2018-018.6)
(Monthly Edition No. 02/19)


Chapter 9 — Paragraph 104

Delete: “There is a launching … Pointe au Sable.”

(Q2018-018.7)
(Monthly Edition No. 02/19)


Chapter 9 — Paragraph 112, last line

Add:Private buoys also mark a swimming area in the sector.

(Q2019-021.1)
(Monthly Edition No. 04/19)