PAC 205 — INNER PASSAGE — QUEEN CHARLOTTE SOUND TO CHATHAM SOUND, FIRST EDITION, 2002


Chapter 2 — Paragraph 465, last line

Add: A submarine cable (power) close north of the pipeline extends from the shore 0.2 mile into Kitimat Arm and then 0.1 mile north to an underwater platform at the approximate depth of 38 m.

(P2016-7.1)
(Monthly Edition No. 6/16)


Chapter 2 — Paragraph 483

Delete: “A starboard hand light buoy marks … privately operated.”
Replace by: Both buoys are privately operated.

(P2016-26.1)
(Monthly Edition No. 11/16)


Chapter 3 — Paragraph 31, after “in the vicinity of Triple Islands.”

Insert: Also 5.5 nautical miles to the east is a pilot transfer area by helicopters.

(P2015-39.1)
(Monthly Edition No. 1/16)


Chapter 3 — Paragraph 184

Delete: 6.9 m
Replace by: 9.1 m

(P2015-37.1)
(Monthly Edition No. 1/16)


Chapter 3 — After paragraph 197

Insert: 197.1    A submarine cable (power) is laid from the shore near the Prince Rupert radiobeacon extending 0.3 mile to an underwater platform at a depth of 24 m.

(P2016-5.1)
(Monthly Edition No. 6/16)


Chapter 3 — Adjacent to paragraph 197.1, add a caution pictograph.

(P2016-5.2)
(Monthly Edition No. 6/16)


Chapter 3 — After paragraph 259

Insert: 259.1     Kaien Island Sector light (703.3), 0.7 mile north of Barrett Rock, is shown from a square skeleton tower on top of a three pile dolphin. This sector light is owned by the Port of Prince Rupert and is activated for 30 minutes by keying VHF 17 five times at one second intervals.

(P2016-8.1)
(Monthly Edition No. 6/16)


Chapter 3 — Adjacent to paragraph 259.1, add a light pictograph.

(P2016-8.2)
(Monthly Edition No. 6/16)


Chapter 4 — Delete paragraph 75 and the adjacent caution pictograph.

(P2016-25.0)
(Monthly Edition No. 10/16)


APPENDICES — Marina Facilities Table

Delete the Marina Facilities Table and replace with the new one provided in Section 4 of this Monthly Edition.

(P2016-17.1)
(Monthly Edition No. 7/16)