PAC 201 — JUAN DE FUCA STRAIT AND STRAIT OF GEORGIA, FIRST EDITION, 2012


Chapter 1 — Paragraph 13, after “Traffic Lane Separation light

Insert: and whistle

(P2016-24.1)
(Monthly Edition No. 9/16)


Chapter 1 — Paragraph 13, after “has Racon (— — —)”

Insert: and an Automatic Identification System (AIS).

(P2015-38.1)
(Monthly Edition No. 1/16)


Chapter 5 — Paragraph 134, last line

Add: A designated anchorage area for recreational vessels exists east of the Pacific Coast Terminals. A permit is required for overnight stays and can be obtained by phoning the City of Port Moody at 604-469-4552.

(P2016-22.1)
(Monthly Edition No. 9/16)


Chapter 5 — Delete paragraph 186

Replace by: 186     Kitsilano Coast Guard Base and a wharf are on the SW shore just before the Burrard Bridge. A floating breakwater protects the docks on the south side of the wharf.

(P2016-04.1)
(Monthly Edition No. 6/16)


Chapter 5 — Adjacent to paragraph 186, add a lifesaving station pictograph.

(P2016-04.2)
(Monthly Edition No. 6/16)


Chapter 5 — Paragraph 187, after “NW corner of the”

Insert: Coast Guard

(P2016-04.3)
(Monthly Edition No. 6/16)


Chapter 6 — Paragraph 365, last line

Add: Two wrecks with 5.2 m and 5.1 m over them lie south of the boat ramp close to shore.

(P2016-12.3)
(Monthly Edition No. 7/16)


Chapter 6 — Paragraph 370, last line

Add: A wreck with 5.2 m over it lies south of the wharf on the west side of the charted underwater rock and another wreck with 0.2 m over it lies on the east side of the same rock.

(P2016-12.1)
(Monthly Edition No. 7/16)


Chapter 6 — Adjacent to paragraph 370, add a caution pictograph.

(P2016-12.2)
(Monthly Edition No. 7/16)


Chapter 6 — Paragraph 411, after “below-water rocks in it.”

Insert: A wreck with 2 m over it lies east of Church Cove, approximately 0.1 mile from shore.

(P2016-13.1)
(Monthly Edition No. 7/16)


Chapter 6 — Adjacent to paragraph 411, add a caution pictograph.

(P2016-13.2)
(Monthly Edition No. 7/16)


Chapter 6 — Paragraph 416

Delete: with less than 2 m over it
Replace by: with 0.8 m over it

(P2016-10.1)
(Monthly Edition No. 7/16)


Chapter 6 — Paragraph 417, after “the piles extending from it.”

Insert: A wreck with 4.5 m over it lies SW of the piles.

(P2016-11.1)
(Monthly Edition No. 7/16)


Chapter 6 — Paragraph 512, last line

Add: A wreck that covers and uncovers lies close to shore, NW of the breakwater.

(P2016-16.1)
(Monthly Edition No. 7/16)


Chapter 6 — Adjacent to paragraph 512, add a caution pictograph.

(P2016-16.2)
(Monthly Edition No. 7/16)


Chapter 7 — After paragraph 44

Insert: 44.1    Designated deep sea ship anchorage NA-1 lies in the centre of Northumberland Channel across from Harmac. Two wrecks lie in the vicinity of the anchorage; one, with 67 m over it, lies just north and the other, 1 mile NW, has 105 m over it.

(P2016-09.1)
(Monthly Edition No. 7/16)


Chapter 7 — Adjacent to paragraph 44.1, add caution and anchorage pictographs.

(P2016-09.2)
(Monthly Edition No. 7/16)


Chapter 8 — Paragraph 9

Delete: Comox Traffic
Replace by: Victoria Traffic

(P2016-18.1)
(Monthly Edition No. 7/16)


Chapter 8 — Delete paragraph 10

Replace by: 10    Special operating procedures when changing from Sector One to Sector Four require:

        
  1. Northbound vessels to call Victoria Traffic Channel 11 and check out of Sector One then call Victoria Traffic Channel 71 for Sector Four
  2.     
  3. Southbound vessels to call Victoria Traffic Channel 71 and check out of Sector Four then call Victoria Traffic Channel 11 for Sector One.

(P2016-18.2)
(Monthly Edition No. 7/16)


Chapter 8 — Paragraph 12

Delete: (Comox Traffic)
Replace by: (Victoria Traffic)

(P2016-18.1)
(Monthly Edition No. 7/16)


Chapter 8 — Delete paragraph 244.

(P2016-18.4)
(Monthly Edition No. 7/16)


Chapter 9 — Paragraph 101

Delete: 2.2 m
Replace by: 1.3 m

(P2016-14.1)
(Monthly Edition No. 7/16)


Chapter 9 — Delete paragraph 339.

(P2016-27.1)
(Monthly Edition No. 7/16)


Chapter 10 — Paragraph 251

Delete: least depth of 19 feet (5.8 m)
Replace by: least depth of 13 feet (3.9 m)

(P2015-42.1)
(Monthly Edition No. 2/16)


INDEX — After “Chum Point, C9/P282”

Insert: Church Cove, C6/P411

(P2016-13.3)
(Monthly Edition No. 7/16)


INDEX — After “Comox Harbour, C8/P161”

Delete: Comox Marine Communications and Traffic Services Centre, C8/P244

(P2016-18.5)
(Monthly Edition No. 7/16)


INDEX — After “Kitsilano Beach, C5/P13”

Insert: Kitsilano Coast Guard Base, C5/P186

(P2015-04.4)
(Monthly Edition No. 6/16)